Modern Matter: an India supply chain built in 12 months.

How BCube built Modern Matter's India supply chain in 12 months, cut defects from 25-30% to under 2% and logistics cost by 80%.

Book a diagnostic

Client: Modern Matter

Headline result: Defects 25-30% → under 2% · Logistics cost down 80% · Built in 12 months

The challenge

Modern Matter designed and marketed in the US and manufactured through a network of factories in India. Roughly one in four pieces failed, and most failures were only found in the US, after the goods had crossed an ocean. Delays were frequent and sometimes severe, causing stockouts, and logistics costs kept rising even as volumes grew.

What we did

Quality at the source. The factories weren’t careless; nobody had told them what good looked like. There were no material specs, no tolerances and drawings in inches for workshops that work in millimetres. We created engineering drawings for every SKU, converted to metric with tolerances; wrote a quality guide showing each factory what counts as a defect; worked with the suppliers to design jigs and fixtures so the most common errors couldn’t happen; and put our inspectors on finished-goods checks before dispatch.

Sourcing strategy. We re-matched SKUs to manufacturers by demand and complexity against capability and capacity.

Inventory and visibility. We set up regular reporting of production and fulfilment, with safety stock and re-order points.

Logistics. We mapped the network, set up a local hub in India to consolidate shipments, and, once production was under control, moved freight from air to sea.

People and process. Over 12 months we built the full supply chain: factory network, contracts, quality protocols, logistics and a local team to run it.

The result

  • Defect rate down from 25-30% to under 2%
  • Logistics cost down 80% after the move from air to sea; sea-freight optimisation typically adds a further 10-15%
  • No more stockouts, shorter lead times and the flexibility to launch new products

Typical outcomes; results vary with the starting point.

“We were looking for a reliable partner to help us source from India and Ram & his team worked out to be all that and more for us!” Katherine Mulford, Chief Creative Officer, Modern Matter

What I took from it: None of this is clever. It is being on the factory floor early, and staying there until the factory’s own process does the work. Ram Raghuraman

Related: Quality Assurance & Control · Order & Delivery Control · Home Hardware, Decor & Lighting

Have a similar problem? Book the diagnostic.

Free. No obligation. A written summary within two business days.

Book a 30-minute India sourcing diagnostic

You speak with me, not a salesperson.

Free 30-minute call

Bring the sourcing problem. We’ll tell you where the gap is.

No obligation. A short written summary within two business days — and you speak with Ram, not a salesperson.

Book your India sourcing call

Privacy controls