Book a 30-minute diagnostic ↗

whitepaper · Pan-India

Moving from China to India: the 2027 playbook.

Which parts to move from China to India first, how to compare landed cost after the 2026 tariff reset, and the gates before India carries volume.

Book a diagnostic

Summary

Tariffs have become the weather of global sourcing: everyone talks about them and nobody controls them. This paper sets out when India is a credible second source, which parts to move first, how to compare landed cost fairly, and the gates an Indian supplier must pass before it carries real volume. The aim is a supply chain that can absorb the next change in rates, whatever it is.

Where the duties stand

Since 24 July 2026, a Section 301 action on forced-labour practices covers goods from 60 economies at 10% or 12.5%. India is in the lower tier at 10%. China is at 12.5%, on top of its existing Section 301 duties of 7.5% to 25% on most goods (up to 100% on some). Section 232 goods such as steel, aluminium and copper are treated separately. Last verified 13 November 2026.

The headline gap, 10% against 12.5%, looks small. The real gap is the stack. That is why comparing country rates is the wrong exercise: compare the landed cost of your actual product, line by line.

Field note. At Terex we ran best-cost-country business cases across India, China and Mexico. The numbers that decided them were never the quote. They were freight, yield, rejects and how long it took a new supplier to run without help.

Signs you are ready to move

  • China is one of your top two sources, and India is already in your top five
  • You have parts in categories where India is strong (below)
  • You can run China and India in parallel for at least two production cycles
  • Someone, yours or ours, can be on the Indian supplier’s floor

Which parts move first

Move first Move with care Usually keep in China for now
Machined, cast, forged and fabricated metal parts; brass and steel hardware; wood and metal decor; leather goods; home textiles; pump and valve bodies Electrical assemblies, wire harnesses, ceramics, kitchenware needing food-contact tests, products with complex packaging Parts whose supply is concentrated in China: some electronic components, magnets, specialised actuators. Plan a dual source

Compare landed cost per good unit

Cost per good unit = (P + F + D + I + r × R) ÷ (1 − r), where P is price, F freight, D duty, I inspection, r the reject rate and R the cost of a reject. Keep duty on its own line so you can re-run the comparison when rates change. Try the calculator.

The gates before India carries volume

  1. Site audit passed
  2. First article approved against your China golden sample
  3. Pilot lot inspected and accepted
  4. Three consecutive on-time lots at agreed quality
  5. Open corrective actions closed and verified

Field note. At Terex, North American steel grades weren’t available in India or China. We qualified local grades as approved substitutes, each tested first. Approving a supplier tells you who. Approving the testing tells you what you are actually getting.

Rules for the dual-source period

  • Keep China shipping until India passes gate 4
  • Split volume deliberately, not by accident
  • Put a tariff-change clause in new contracts so a duty change triggers a conversation, not a dispute

What to watch in 2027

The US-China truce runs to 10 January 2027. A separate Section 301 investigation into industrial excess capacity covers China, India and others. A US-India trade deal is being finalised. In Europe, the EU-India FTA is expected to enter into force; Australia already imports Indian goods duty-free under ECTA. Any of these can move the numbers. A supply chain with a qualified second source can absorb them.

What to do on Monday

  1. Run a landed-cost comparison on your top 10 parts, with duty as a separate line.
  2. Qualify a second source in India through a pilot order, before you need it.
  3. Add a tariff-change clause to new contracts.

Book a 30-minute diagnostic and send five SKUs: we’ll show you the China-vs-India landed cost under today’s duties.

By Ram Raghuraman, Founder, BCube Global Solutions · CPSM · Director, ISM India · Published November 2026

[Download the PDF]

Want this applied to your suppliers? Book the diagnostic.

Free. No obligation. A written summary within two business days.

Book a 30-minute India sourcing diagnostic

You speak with me, not a salesperson.

Free 30-minute call

Bring the sourcing problem. We’ll tell you where the gap is.

No obligation. A short written summary within two business days — and you speak with Ram, not a salesperson.

Book your India sourcing call

Privacy controls