Book a 30-minute diagnostic ↗

service · Pan-India

Should-costing: know the real cost before you negotiate.

Should-cost models, quote testing and landed-cost comparisons after tariffs, freight and rejects, with a phased cost-down plan. $4M+ for ABB.

Book a diagnostic

Label: Capability · Cost

BCube builds should-cost models for your parts from raw material, process, labour, overhead and margin, tests every quote against them, and compares landed cost per good unit after duty, freight, inspection and rejects. Then we run a phased cost-down plan with your suppliers, project by project.

Book a 30-minute India sourcing diagnostic

ABB: $4M+ in annualised savings in Indian metal and fabrication. Terex (Ram, before BCube): $8M+ a year (24% YoY) on $200M+ of spend.

Who this is for

Buyers facing tariff-driven cost pressure, paying prices nobody has tested, or about to negotiate a large Indian contract.

What usually goes wrong

What you see What is usually behind it
A quote that looks too good No model to check material, process and yield
Savings on paper, not in the P&L Rejects, rework and rescue freight not counted
Cost-down asks that suppliers ignore No fact base the supplier can agree with
Too many ideas, nothing delivered Projects not ranked by cost to implement against savings

Send us one drawing and your current price. We’ll tell you what it should cost. Book a diagnostic

What we do

  1. Should-cost models. Local raw material prices and the value added at each manufacturing step
  2. Quote testing. Line by line against the model, so negotiation starts from facts
  3. Landed cost per good unit. Price, freight, duty, inspection and rejects (see the calculator)
  4. Cost-benefit ranking. Projects ranked by cost to implement against expected savings
  5. Phased sourcing waves. Implemented category by category with the suppliers

Proof

For ABB’s businesses in Europe and the Americas, BCube built standard business cases across categories, should-costed them using local raw material prices and process steps, identified 16+ opportunities and recommended phased sourcing waves that delivered more than $4M in annualised savings. Read the ABB case

How you get it

Runs inside a programme ($10,000-35,000) or your India Desk (from $4,500 a month, 3-month minimum). Most clients start with a Sourcing Assessment ($3,000-7,500).

We don’t take inspection-only work. See engagements & investment

Related: Toolkit: Landed-cost calculator · ABB case study · Whitepaper: What Should It Cost? · Castings, Forgings & Machined Components

Send us one drawing and your current price. We’ll tell you what it should cost.

Free. No obligation. A written summary within two business days.

Book a 30-minute India sourcing diagnostic

You speak with me, not a salesperson.

Questions

Straight answers.

Can you test a quote that looks too low?

Yes. The should-cost shows where a quote doesn't add up, which often means a different material, a skipped process or a sub-tier supplier you haven't seen.

How is landed cost per good unit calculated?

Unit price plus freight, duty and inspection per unit, plus the reject rate times the cost of handling a reject, divided by the share of good units. Our free calculator shows the working.

Do you take a share of the savings?

Not by default. Fees are fixed or monthly, and a results-linked portion can be agreed after the diagnostic.

Free 30-minute call

Bring the sourcing problem. We’ll tell you where the gap is.

No obligation. A short written summary within two business days — and you speak with Ram, not a salesperson.

Book your India sourcing call

Privacy controls